You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Rampung, Kampung Pulo Bebas Banjir

Kampung Pulo is Safe from Flood If Normalization Project Finished

East Jakarta Mayor, Bambang Musyawardhana acknowledged that Kampung Pulo area, Kampung Melayu, East Jakarta will be free from flood in the mid January 2016.

We’ve prepared pump machine. There are 4 machines from BBWSCC and Water Management Department

Basuki Ensures Jatinegara Barat Is Safe From Flood

To accelerate normalization project, the Ciliwung-Cisadane Flood Control Office (BBWSCC) keeps intensifying the sheet pile installation. The target itself is targeted to be finished in mid January 2016.

Apart from that, Flood remains occurred in Kampung Pulo at RW 02 and 03, Kampung Melayu Urban Village.

“Water flowing from unfinished sheet pile construction,” he uttered, Tuesday (12/1).

Furthermore, his side has anticipated bigger flood by alerting pump machine in the area.

“We’ve prepared pump machine. There are 4 machines from BBWSCC and Water Management Department,” he asserted.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1626 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1457 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1321 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1095 personDessy Suciati
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye981 personDessy Suciati